Bank of China Shenzhen City Center Branch

CreateDate:2013-12-28  Hits:

In the process of building Low Voltage System for the branch bank, the entire system is designed in accordance with the relevant national standards, selecting the advanced design idea and product. For configuration of the main system and pipeline space, fully considering system scalability in usage, there is reasonable allowance, enabling the system to meet the needs of expansion and development in the future. Meanwhile, for cost saving of the entire system, choosing CAT6 copper cables with high price performance to reduce system cost.

[ Return ]